Imaging systems, ceiling supply units, sterilisation equipment or laboratory devices all have requirements for power, media, ventilation, structure and data. When these requirements reach MEP planning late, changes become expensive.
What helps
- A structured equipment list with technical requirements per device and room.
- Clear responsibility for each interface between medical technology and building services.
- Equipment represented in the BIM model with the parameters other disciplines need.
- Information defined for commissioning and operation, not only for construction.
The goal is not more documentation, but information that is available at the right time, in the right structure, for the people who need it.
